Future Projects
   
These pictures are of the second story of the former Bank Building (now our Historical Society)
as it looked in 2006.

2007
The fall of 2006 brought about several of these changes. The walls forming the small room (former kitchen) at the top of the stairs has been removed. Ozone air purification was done to kill all remaining mold and odor from the leaking roof which was repaired many years ago. The panelling was removed from the south and east walls and the exterior walls studded up. The entire perimeter including the attic area has now been insulated with urethane insulation.

   



2008
 The Society received donations for all 12 windows on the second floor. The completed door and window replacement project exceeded $17,000. Our society greatly appreciates the interest in this project.




May 2009
The windows and jambs have been stained and varnished. Urethane insulation has been sprayed around all of the frames.  Our next step is to have climate control installed.

Old Staircase
New Staircase




2010
The society has received a very generous donation from Don Adams to fund the replacement of our basement and second floor stairway.  Our previous staircase required you to enter from the exterior of our building, while the new staircase will have interior access via our main floor.  The project is expected to be completed by late July.  Please plan to visit!